Shop Playbook
Reading a request for quote and finding what is missing
A request for quote arrives as an email with a drawing. Before anyone can price it, someone has to pin down the part, revision, material, quantities, operations and delivery, and notice what the customer left out or got wrong. Gaps found late mean a requote or a job run at a loss.
Free to use · test case included · a person decides everything
What changes
The estimator starts from a filled-in worksheet and a list of questions, with the aim that quotes go out sooner and fewer come back for correction. Whether they do in your shop is something to test. The estimator still reads the drawing, sets the price and decides what to promise.
What you get back
- Part, drawing and revision, with any conflict between the email and the drawing called out.
- Material as stated in each place, without picking one.
- The quantity to price now, and a question about release sizes when the customer mentions a yearly figure.
- Operations named in the request, marked in house or outside, with the days outside work adds.
- The lead time under your own rules, shown as a sum and set against the date requested.
- A plain list of what a person must still read from the drawing itself.
What you need to give it
A short fact sheet about your shop (what you cut, form, weld and finish in house, standard lead time, minimums), the text of the RFQ email, and the text you can copy out of the drawing PDF: the title block and the notes. This does not read the drawing's geometry. It reads words.
How it did on the test case
The test case further down was written with 9 things in it for the tool to find or to handle correctly. They were put there on purpose. Two different AI models were given the same instructions on 25 November 2026.
| In the test case, on purpose | Google Gemini (gemini-4-carbon) | OpenAI GPT-6 (gpt-6-astra) |
|---|---|---|
| Revision conflict: email says C, the attached drawing is B | Found | Found |
| Material conflict: email says 304, drawing says 316L | Found | Found |
| 1,000 a year is a forecast; ask what release sizes to price | Found | Found |
| Stainless welding goes to an outside shop and adds 5 working days | Found | Found |
| Finish note 4 cannot be read | Found | Found |
| The date requested falls well inside the lead time the shop can offer | Found | Found |
| Transit to the customer's dock is not included in the lead time | Found | Found |
| Material certificates must be asked for before material is bought | Found | Found |
| Says what a person must still read from the drawing itself | Found | Found |
| Total | 9 of 9 | 9 of 9 |
Read this for what it is
It is one tidy, made-up case, run once on each model. It shows the instructions do the job on a clean example. It does not tell you how often they will be right on your own paperwork, which is messier, and it is not a measure of time or money saved. We scored it by searching each answer for the expected finding and then reading the answers. Both full answers are at the bottom of the page so you can judge for yourself.
How to check the answer
- Compare the revision and material on the worksheet with the drawing yourself. This is where the costly mistakes are.
- Confirm the outside operations against how the job was really run last time.
- Treat the lead time as arithmetic on your own rules, not a promise.
- Run your first three real cases alongside your normal way of doing the job before relying on it.
Where this goes wrong
- It reads the words you give it, not the drawing. Bends, hole patterns, tolerances and weld details still need a person.
- A fact sheet that flatters the shop. If it says you weld stainless and you send it out, the lead time will be wrong.
- Scans where notes cannot be read. The sheet will say so; someone still has to get a clean drawing.
- It does not know what you charged last spring unless you give it that.
Try it yourself
Copy everything in the box into your AI tool. It holds the instructions and the made-up test case. When you are ready to use your own, replace today's date, the section on what your shop can do, and the RFQ email and drawing text at the end.
Before you paste anything
Use an AI account your company has approved for business use, one that does not train on what you type. Do not paste drawings or data covered by a customer's confidentiality agreement or by export controls (ITAR or EAR). Taking the names off a drawing does not make it safe to share. When in doubt, try the made-up test case first.
You are helping the person who prepares quotes at a small metal fabrication shop. Read the request for quote below and prepare a worksheet for them. They decide what to quote. Do not guess a price, and do not fill a gap with an assumption: list it as a question. What our shop can do (the only facts you may rely on about us): - Laser cutting: mild steel to 1/2 in, stainless to 1/4 in, aluminum to 3/16 in. - Press brake forming up to 8 ft. Hardware insertion. Deburring. - Welding of mild steel in house. Stainless and aluminum welding is sent to an outside shop and adds 5 working days. - Finishes done in house: none. Powder coat and passivation are outside services and add 5 working days each. - Standard lead time: 4 weeks from receipt of order and released drawing. Rush is sometimes possible and must be approved by the shop manager. - Minimum order: $500. Quotes are valid 30 days. Material certificates can be supplied if requested before we buy material. Today is Monday 7 December 2026. Rules: - An annual figure is a forecast, not an order. Price the quantity ordered now and ask what release sizes the customer wants priced. - Work out the lead time from our own rules, adding the days for each outside operation, and show the sum. Compare it with the date requested, and say that transit time to the customer's dock is not included. - You are reading the email and the text copied from the drawing. You cannot see the drawing itself, so say what a person must still read from it. Return exactly these three sections and keep the whole answer under 380 words: A. QUOTE WORKSHEET: part, drawing and revision; material; quantities to price; operations needed, marking which are in house and which go outside; lead time we could offer and why. B. QUESTIONS BEFORE QUOTING: numbered and in plain words. First the ones to settle inside our own company, then the ones for the customer. Put anything that conflicts or is missing here. C. WHAT I ASSUMED OR COULD NOT CHECK. REQUEST FOR QUOTE (email as received): From: purchasing at Marlow Conveyor Subject: RFQ - guard bracket GB-2207 Hi, please quote the attached guard bracket, drawing GB-2207 rev C, same as the ones you made for us last spring. Material is 304 stainless, 12 gauge. We need 250 pieces now and expect about 1,000 a year going forward. The two halves get welded per the drawing. Need parts on our dock by December 21. Please include material certs. Quote needed by Friday. Attachment list shown in the email: GB-2207_revB.pdf Text visible in the drawing title block of the attachment: GUARD BRACKET GB-2207, REV B, MATERIAL: 316L SST 12 GA, FINISH: SEE NOTE 4. (Note 4 is not legible in the scan.)
The two answers, unedited
Exactly what each model returned on 25 November 2026, with nothing removed.
Google Gemini (gemini-4-carbon)
A. QUOTE WORKSHEET - Part, Drawing, Revision: Guard bracket, GB-2207. (Conflict: email requests Rev C; attached file is Rev B.) - Material: 12 ga stainless steel; request material certs before buying material. (Conflict: email says 304; drawing says 316L.) - Quantities to Price: 250 pieces now (1,000/year is a forecast only). Minimum order $500; quote valid 30 days. - Operations Needed: - In-house: Laser cutting, deburring, plus press brake forming and hardware insertion if shown on drawing. - Outside: Stainless welding (+5 working days); Finish per Note 4 (no in-house finishes; powder coat and passivation add +5 working days each). - Lead Time: 4 weeks standard + 5 working days (welding) = 4 weeks + 5 working days—or 4 weeks + 10 working days (one finish) or 4 weeks + 15 working days (both finishes)—from receipt of order and released drawing. Today is Mon 7 Dec 2026; requested dock date of Dec 21 is only 2 weeks away, so standard lead time misses Dec 21. Transit time to the customer's dock is not included. (Quote requested by Friday, Dec 11.)
B. QUESTIONS BEFORE QUOTING Inside our company: 1. From last spring's job for GB-2207, what revision, material, operations, and finish did we supply? 2. Will the shop manager approve a rush, and what is the earliest ship date we can offer toward Dec 21?
For the customer: 3. Your email asks for Rev C, but Rev B is attached—please send released Rev C (our lead time starts once we have it). 4. Should we quote 304 stainless (per email) or 316L stainless (per drawing)? 5. Note 4 on the scan is unreadable—what finish is required, if any? 6. For the 1,000/year forecast, what release sizes do you want priced? 7. Standard lead time is 4 weeks plus 5 to 15 working days for outside welding/finishing (excluding transit), missing Dec 21—what delivery date is acceptable?
C. WHAT I ASSUMED OR COULD NOT CHECK - I made no assumptions. - A person must still read from the drawing: flat dimensions of both halves, confirmation that 12 ga fits our 1/4 in stainless laser limit, bend lengths (8 ft max) and counts, hardware insertions, weld callouts, and whether Note 4 requires a finish outside powder coat or passivation. - Transit time to the customer's dock could not be checked.
OpenAI GPT-6 (gpt-6-astra)
A. QUOTE WORKSHEET
- Customer/part: Marlow Conveyor; guard bracket GB-2207, welded two-half assembly.
- Drawing/revision: Email requests rev C; attachment filename and copied title block say rev B. Release revision unresolved.
- Material: Email specifies 304 stainless, 12 gauge; title block specifies 316L stainless, 12 gauge. Grade and actual thickness require confirmation.
- Quantities to price: 250 now, subject to confirmation that “pieces” means complete assemblies. Approximately 1,000/year is a forecast, not an order; request future release sizes.
- Operations: Laser cutting in house, subject to confirmed thickness within 1/4-inch stainless capacity. Deburring in house. Forming and hardware insertion in house if required, subject to drawing review and 8-foot forming limit. Stainless welding outside: +5 working days. Finish unresolved: no finishing in house; powder coat or passivation outside: +5 working days each.
- Lead time: Known-operation baseline: 4 weeks from order and released drawing + 5 working days welding = 5 working weeks, excluding transit to the customer’s dock. If both arrive December 7, nominal completion is January 11, 2027, before holiday-calendar adjustments. Each required outside finish adds another 5 working days. December 21 dock delivery cannot meet standard timing; rush requires manager approval.
- Terms: $500 minimum order; quote valid 30 days. Include requested material certificates and arrange them before material purchase.
B. QUESTIONS BEFORE QUOTING
Inside our company 1. Can the manager approve a rush, and can the outside welder, any finisher, and shipping support December 21 delivery? What holiday closures affect timing? 2. Can we review the actual drawing for manufacturability and find last spring’s records without treating them as the current specification?
For the customer 3. Which revision governs? Please send a legible, released drawing resolving rev B versus rev C. 4. Is the material 304 or 316L, and what decimal thickness defines 12 gauge? 5. What does note 4 require? 6. Does 250 mean complete welded assemblies? What future release sizes should we price? 7. What dock address and shipping requirements apply? Is delivery flexible? 8. Is the quote due Friday, December 11?
C. WHAT I ASSUMED OR COULD NOT CHECK
No gap-filling assumptions. A person must read dimensions, tolerances, bends, hardware, weld requirements, and all notes from the actual drawing. Prior production and holiday calendars remain unverified.
If you want this without the pasting
The same worksheet, drafted from the email text and from files that can be read cleanly, with your shop's fact sheet and past jobs for the same part number alongside, and the questions drafted as a reply for the estimator to send or change. The estimator still reads the drawing.
That is the kind of job our 30-Day AI Workflow Pilot is for: one workflow, tested onsite with the person who does the job today, at a fixed price agreed before we start. You get the instructions in plain words your own staff can change, and a straight answer on whether it is worth keeping.
We do not ask you to send us confidential drawings, customer files or pricing to find out.