What changes

The order desk gets a one-page check sheet and a short list of questions in about a minute. The aim is that the same people get through more orders on a busy day; try it alongside your normal routine to see whether it does. The person at the desk still decides everything and still enters the order.

What you get back

  • A row for each PO line: what the customer wrote, the part it probably is, and how sure the match is.
  • Every price that differs from list, flagged as a question (the customer may hold a quote), never changed.
  • The earliest possible ship date per line, marked as needing confirmation and not counting transit.
  • Arithmetic re-done, saying exactly which figure is wrong and which is right.
  • Questions split in two: those to settle inside the company first, then those for the customer.

What you need to give it

Your price list with stock on hand, the customer's terms and ship-to on file, and the text of the PO. If the PO is a scan, type or copy the lines in and check the quantities before you start.

How it did on the test case

The test case further down was written with 9 things in it for the tool to find or to handle correctly. They were put there on purpose. Two different AI models were given the same instructions on 25 November 2026.

In the test case, on purposeGoogle Gemini (gemini-4-carbon)OpenAI GPT-6 (gpt-6-astra)
Price on the 18 in skimmer is below list ($449 against $468)FoundFound
Line 4 does not multiply out: 7 x $61 is $427, not $437FoundFound
The grand total is right even though line 4 is wrongFoundFound
Drip tray is not on the price list (asked about, not refused)FoundFound
Only 2 of the 3 skimmers ordered are on handFoundFound
18 in belts: none on hand, earliest ship date is after the need-by dateFoundFound
Terms differ: PO says 2% 10 Net 45, file says Net 30FoundFound
Dock differs: PO says Dock 2, file says Dock 3FoundFound
Transit time is not included in any dateFoundFound
Total9 of 99 of 9

Read this for what it is

It is one tidy, made-up case, run once on each model. It shows the instructions do the job on a clean example. It does not tell you how often they will be right on your own paperwork, which is messier, and it is not a measure of time or money saved. We scored it by searching each answer for the expected finding and then reading the answers. Both full answers are at the bottom of the page so you can judge for yourself.

How to check the answer

  • Re-add the total yourself once. It takes a minute and catches the most.
  • Look at every line marked likely or no match. Those are the ones a person must decide.
  • Check that stock shown as on hand is not already promised to another order.
  • Read section C. If something you care about is listed there, the tool did not have it.
  • Run your first three real cases alongside your normal way of doing the job before relying on it.

Where this goes wrong

  • A price list that is out of date. The tool will flag correct prices as differences.
  • Customer-specific pricing that lives in someone's head. Put it in the list or expect questions on every order.
  • Scanned or photographed orders. Confirm the quantities were read correctly before anything else.
  • An item missing from the list is not the same as an item you cannot supply. The sheet asks; it does not answer.
  • A ship date is not a delivery date. Transit is never included.

Try it yourself

Copy everything in the box into your AI tool. It holds the instructions and the made-up test case. When you are ready to use your own, replace today's date, the price list, the customer facts on file and the purchase order at the end.

Before you paste anything

Use an AI account your company has approved for business use, one that does not train on what you type. Do not paste drawings or data covered by a customer's confidentiality agreement or by export controls (ITAR or EAR). Taking the names off a drawing does not make it safe to share. When in doubt, try the made-up test case first.

You are helping the order desk at a small manufacturer. Read the customer's purchase order below and prepare a check sheet for the person who enters orders. That person makes every decision. Do not guess, and do not decide for them.

Rules:
- Our price list is the only source for part numbers and list prices. A price on the PO that differs from list is NOT automatically wrong: the customer may have a quote. Flag it and ask; do not replace it.
- An item that is not on our list is NOT automatically unavailable. Flag it and ask what it is.
- "On hand" means in stock today. It may already be promised to other orders, so give the earliest POSSIBLE ship date and say it must be confirmed.
- The customer's "need by" date is when they want it on their dock. You do not know the transit time, so compare ship dates with it and say that transit is not included.
- When figures do not add up, say exactly which figure is wrong and which is right. A wrong line can sit under a correct total.

Our price list and stock:
PART | DESCRIPTION | LIST PRICE | ON HAND | LEAD TIME IF NOT ON HAND
BS-12 | Belt skimmer, 12 in reach | 412.00 | 9 | 10 working days
BS-18 | Belt skimmer, 18 in reach | 468.00 | 2 | 10 working days
BLT-12 | Replacement belt, 12 in | 38.50 | 40 | 5 working days
BLT-18 | Replacement belt, 18 in | 44.00 | 0 | 5 working days
MNT-U | Universal mounting bracket | 61.00 | 15 | 5 working days
Terms on file for this customer: Net 30. Ship-to on file: 1420 Harbor Rd, Dock 3, Erie, PA 16501. Today is Monday 7 December 2026.

Return exactly these three sections and keep the whole answer under 380 words:
A. CHECK SHEET: one row per PO line: line as written | our part and how sure (exact / likely / no match) | PO price vs list price | earliest possible ship date.
B. QUESTIONS BEFORE ENTRY: numbered and in plain words. First the ones to settle inside our own company, then the ones for the customer. Include any arithmetic that does not add up, with your own figures.
C. WHAT I ASSUMED OR COULD NOT CHECK.

PURCHASE ORDER (as received by email):
Lakeshore Tool & Die, PO 44817, dated 12/4/26
Ship to: 1420 Harbor Road, Dock 2, Erie PA 16501
Need by: 12/11/26   Terms: 2% 10 Net 45
1. 12" belt skimmer, qty 4 @ 412.00 = 1,648.00
2. 18 inch skimmer qty 3 @ 449.00 = 1,347.00
3. belts for the 18" units, qty 6 @ 44.00 = 264.00
4. mounting brkt universal, qty 7 @ 61.00 = 437.00
5. drip tray, qty 3 @ 29.00 = 87.00
Total 3,773.00

The two answers, unedited

Exactly what each model returned on 25 November 2026, with nothing removed.

Google Gemini (gemini-4-carbon)

A. CHECK SHEET 1. 12" belt skimmer, qty 4 @ 412.00 = 1,648.00 | BS-12 (likely) | $412.00 matches list | 12/7/26 (must be confirmed) 2. 18 inch skimmer qty 3 @ 449.00 = 1,347.00 | BS-18 (likely) | PO $449.00 vs list $468.00 | 2 on 12/7/26, 1 on 12/21/26 (must be confirmed) 3. belts for the 18" units, qty 6 @ 44.00 = 264.00 | BLT-18 (likely) | $44.00 matches list | 12/14/26 (must be confirmed) 4. mounting brkt universal, qty 7 @ 61.00 = 437.00 | MNT-U (likely) | $61.00 matches list | 12/7/26 (must be confirmed) 5. drip tray, qty 3 @ 29.00 = 87.00 | no match | PO $29.00 vs not on list | unknown (must be confirmed)

B. QUESTIONS BEFORE ENTRY Inside our company: 1. Confirm lines 1–4 match BS-12, BS-18 (PO omits "belt"), BLT-18, and MNT-U. 2. Line 5 ("drip tray"): What is this item, its price, and earliest ship date? 3. Line 2: Does Lakeshore have a quote for $449.00 (list is $468.00)? 4. Terms: Was "2% 10 Net 45" approved, or does "Net 30" on file apply? 5. Stock and schedule: Is on-hand stock unpromised? Comparing ship dates with the 12/11/26 need-by dock date (transit is not included): 12/7/26 items depend on transit time, while line 3 (12/14/26) and 1 unit of line 2 (12/21/26) already miss 12/11/26.

For the customer: 6. Ship to Dock 2 (on PO) or Dock 3 (on file)? 7. Since line 3 (12/14/26) and 1 unit of line 2 (12/21/26) ship after the 12/11/26 dock date—and no ship dates include transit—are split and late shipments acceptable? (Also clarify line 2 pricing or terms if not approved internally.) 8. Arithmetic: Line 4's extension of $437.00 is wrong; $427.00 (7 × $61.00) is right. Written line extensions add up to $3,783.00, meaning the PO total of $3,773.00 is right ($1,648.00 + $1,347.00 + $264.00 + $427.00 + $87.00 = $3,773.00). Confirm Line 4 is $427.00.

C. WHAT I ASSUMED OR COULD NOT CHECK - Assumed Monday–Friday working days with no holidays through 12/21/26, starting from entry today (12/7/26). - Could not check transit time to Erie, stock promised to other orders, quotes, unlisted items, freight, or tax.

OpenAI GPT-6 (gpt-6-astra)

A. CHECK SHEET

Line as written Our part and how sure PO price vs list price Earliest possible ship date
1. 12" belt skimmer, qty 4 @ 412.00 = 1,648.00 BS-12 — likely $412.00 vs $412.00; matches Dec 7, all 4; confirm allocation
2. 18 inch skimmer qty 3 @ 449.00 = 1,347.00 BS-18 — likely $449.00 vs $468.00; $19.00 lower each; ask about quote Dec 7 for 2; Dec 21 for remaining 1; confirm
3. belts for the 18" units, qty 6 @ 44.00 = 264.00 BLT-18 — likely $44.00 vs $44.00; matches Dec 14, all 6; confirm
4. mounting brkt universal, qty 7 @ 61.00 = 437.00 MNT-U — likely $61.00 vs $61.00; matches Dec 7, all 7; confirm allocation
5. drip tray, qty 3 @ 29.00 = 87.00 No match — no listed part $29.00; no list price supplied Unknown; ask

B. QUESTIONS BEFORE ENTRY

Inside our company first 1. Can we confirm the four likely part matches and identify the drip tray, its price, availability and lead time? 2. Is there a quote approving $449.00 for BS-18? Are PO terms “2% 10 Net 45” approved instead of Net 30? Do not replace either without review. 3. Is stock uncommitted? Confirm the dates above, lead-time counting and any holiday closures. 4. Line 4’s $437.00 is wrong: 7 × $61.00 = $427.00. Printed extensions sum to $3,783.00, not $3,773.00. The PO total $3,773.00 is correct using the corrected extension and PO prices. How should this be documented?

Then the customer 5. Should delivery be to Dock 2 on the PO or Dock 3 on file? 6. Please clarify any unresolved item, quote or terms questions above. 7. Dec 14 and Dec 21 shipments are after your Dec 11 dock deadline. Transit is not included; even Dec 7 shipment does not establish arrival. Are partial shipments or revised dates acceptable?

C. WHAT I ASSUMED OR COULD NOT CHECK.

Used the supplied Dec 7 planning date; counted weekdays after it. Allocation, transit, holidays and lead-time start remain unconfirmed. No listed part numbers appear on the PO. Unlisted does not mean unavailable.

If you want this without the pasting

The same check, reading the price list and stock from a file your system already exports and picking up orders from a shared inbox, with the check sheet waiting for the order desk each morning. Getting a clean export out of an older system is usually the hard part, and we find that out together before quoting. Nothing is entered automatically.

That is the kind of job our 30-Day AI Workflow Pilot is for: one workflow, tested onsite with the person who does the job today, at a fixed price agreed before we start. You get the instructions in plain words your own staff can change, and a straight answer on whether it is worth keeping.

Ask whether a pilot fits

We do not ask you to send us confidential drawings, customer files or pricing to find out.

More from the playbook: Read a quote request · Match a supplier invoice · All entries

Written with AI assistance and checked by Bill Burkey. Every company, part, price and person in the test case is made up. northcoast.ai is Bill and Dylan Burkey, father and son, in Northeast Ohio.